VantageWillow Creek Community — Phase 2 · Lakeside Development Co.

Files & Site

What the site looks like right now, the latest drone flight, the weather, and every document on the project.

Live view from the site camera over the Section C work area
LIVECam 1 · Section C
Sep 28 ·  
Counted by the camera today
16workers on site
2 excavators1 loader1 trencher
Ridgeline reported 18 · Kevin is checking the gap

Weather at the site

Lake Mirabel · logged daily, Grex can correct it

89°/ 74°
Today, Sep 28 · Light rain early, clearing
Rain
0.3 in
Wind
10 mph
Site
Working
Next 7 daysChance of rain · low / high
  • TomorrowSep 2930%74°89°
  • WedSep 3010%74°90°
  • ThuOct 160%73°88°
  • FriOct 220%72°87°
  • SatOct 30%71°86°
  • SunOct 420%72°88°
  • MonOct 540%73°89°
Drone flight Oct 1: 60% chance of storms that day. Skyward flies the next dry morning if it rains.

Drone and site photos

Sep 1 flight · 16 photos · Skyward Site Imaging Next flight Oct 1

Documents

24 files · drawings, permits, contracts and reports, tagged by line item

Add files
PDFs, drawings and photos. Vantage tags each one with its line item.
  • PDF
    Ridgeline pay request 6 (September)
    Other · Ridgeline · v1 · 450 KB · added by Kevin
    Whole project· Sep 25
  • PDF
    Turn-lane permit comments (street light)
    Permit · County · v1 · 5.1 MB · added by Kevin
  • XLSX
    Ridgeline's September schedule
    Other · Ridgeline · v4 · 1.8 MB · added by Kevin
    Whole project· Sep 21
  • PDF
    Upgraded skirting price: stone-look panels, $450 per home (Change 14)
    Other · Lakeside · v1 · 5.4 MB · added by Andrew
  • PDF
    Electric layout, Sections C and D (utility, version 2)
    Drawing · Electric utility · v2 · 2.7 MB · added by Kevin
  • PDF
    Fire marshal review letter (two more hydrants)
    Other · County · v1 · 4.7 MB · added by Kevin
  • PDF
    Standard deck and step plans, approved by the county
    Drawing · Lakeside · v2 · 3.2 MB · added by Kevin
  • PDF
    Pad sign-off letter, Sections A and B
    Report · Harbor · v1 · 1.3 MB · added by Kevin
  • PDF
    Water pressure and bacteria tests, Sections A and B
    Report · Harbor · v1 · 2.7 MB · added by Kevin
  • PDF
    Sewer test report, Sections A and B
    Report · Harbor · v1 · 4.8 MB · added by Kevin

Rain days

Ridgeline's contract carries 10 a year. After that, rain means more time, not more money.

September so far
15
rain days
3
work stopped
43h
hours lost
Allowance10 of 10 used · ran out Jul 2
10 days the builder carries at its own risk+6 working days beyond it, logged as weather delays (Changes 6 and 13): time, not money1 more stopped day, made up on a Saturday: no working day lost
By monthRain daysWork stopped
Jul14 · 6 stopped
Aug13
Sep15 · 3 stopped

File requests

3 waiting · each one is also an action item

  • Record drawings, Section A and B sewer
    Ridgeline · Dana Whitfield5 days late
  • Updated conduit drawings, Sections C and D
    Electric utility · Nora QuistDue Oct 2
  • Insurance certificate (renewal)
    Sandhill · Rosa DelgadoDue Oct 9
  • Pad sign-off letter, Sections A and B
    Harbor · Priya NairReceived Sep 9